Real time monitoring of the piggs
hydraulic driving flow and -pressure enables constant observation of the
pipe cleaning result and the piggs track through the heater.
The water returning from the heater
coils is closely observed for a diminished or non-existent slurry return.
Clean return water and a smooth and consistent trace on the chart
recorder signifies that the progressive pigging program is completed.